skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: High bandwidth beam current monitor

Conference ·
;  [1];  [2]; ;  [3]
  1. Los Alamos National Lab., NM (United States)
  2. EG and G Energy Measurements, Inc., Goleta, CA (United States). Santa Barbara Operations
  3. EG and G Energy Measurements, Inc., Las Vegas, NV (United States). Las Vegas Operations

A stripline directional coupler beam current monitor capable of measuring the time structure of a 30-ps electron beam bunch has been developed. The time response performance of the monitor compares very well with Cherenkov light produced in quartz by the electron beam. The four-pickup monitor is now used on a routine basis for measuring the beam duration, tuning for optimized beam bunching, and centering the bunch in the beam pipe.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-36; AC08-88NV10617
OSTI ID:
6480986
Report Number(s):
LA-UR-93-1833; CONF-930511-96; ON: DE93014737
Resource Relation:
Conference: International particle accelerator conference, Washington, DC (United States), 17-20 May 1993
Country of Publication:
United States
Language:
English