Title: AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

Technical Report ·
DOI:https://doi.org/10.2172/6418579· OSTI ID:6418579

This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martin Marietta Energy Systems, Oak Ridge, TN (USA)
DOE Contract Number:
W-7405-ENG-48; AC05-84OR21400
OSTI ID:
6418579
Report Number(s):
UCID-20196; ON: DE85002958; TRN: 85-000012
Resource Relation:
Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English