Title: Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

Abstract

Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

Publication Date:
Research Org.:
Golder Construction Services, Inc., Redmond, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
641097
Report Number(s):
UCRL-CR-128748
ON: DE98057687; BR: EW2010301; CNN: W-7405-Eng-48
DOE Contract Number:  
W-7405-ENG-48
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Oct 1997
Country of Publication:
United States
Language:
English
Subject:
42 ENGINEERING NOT INCLUDED IN OTHER CATEGORIES; LAWRENCE LIVERMORE NATIONAL LABORATORY; QUALITY ASSURANCE; CONSTRUCTION; SANITARY LANDFILLS; DRAINAGE; DATA

Citation Formats

. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300. United States: N. p., 1997. Web. doi:10.2172/641097.
. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300. United States. https://doi.org/10.2172/641097
. 1997. "Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300". United States. https://doi.org/10.2172/641097. https://www.osti.gov/servlets/purl/641097.
@article{osti_641097,
title = {Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300},
author = {},
abstractNote = {Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.},
doi = {10.2172/641097},
url = {https://www.osti.gov/biblio/641097}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Oct 30 00:00:00 EST 1997},
month = {Thu Oct 30 00:00:00 EST 1997}
}