Title: The CEBAF (Continuous Electron Beam Accelerator Facility) fast shutdown system

Technical Report ·
DOI:https://doi.org/10.2172/6373929· OSTI ID:6373929

Because of the high power in the CEBAF beam, equipment must be protected in the event of beam loss. The policy that has been adopted is to require a positive permissive signal from each of several inputs in order to operate the gun that starts the beam. If the permissive is removed, the gun shuts off within 20 {mu}s. The inputs that are now monitored include radiation monitors that detect beam loss directly, vacuum monitors (which also observe the status of various in-line valves), and general input from the rf system, which combines detection of klystron failure, arcs, and rf window high temperature. The system is expandable, so other fault detectors can be added if experience shows their necessity.

Research Organization:
Southeastern Universities Research Association, Newport News, VA (USA). Continuous Electron Beam Accelerator Facility
Sponsoring Organization:
DOE/ER
DOE Contract Number:
AC05-84ER40150
OSTI ID:
6373929
Report Number(s):
DOE/ER/40150-141; CEBAF-PR-90-015; ON: DE91005092; TRN: 91-000764
Country of Publication:
United States
Language:
English