Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982
Abstract
The Magma Gulf-Technadril/Department of Energy Amoco Fee No. 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982. The Miogypsinoides interval contains seven discrete sands in the test well. These sands have been numbered 1 to 7, beginning at the top of the sequence. Data from wireline logs and core samples suggested that the first zone to be perforated should be Sand 5. Because of its high porosity and permeability, Sand 5 was thought to contain almost 50% of the total hydraulic capacity of the well. Flow testing of Sand 5 was performed in three stages, each of which is fully described in this report. Phase I was designed as an initial clean-up flow and a reservoir confirmation test. Phase II consisted of the reservoir limit determination test and lasted 17 days. Boundaries were confirmed which suggest that the Sweet Lake reservoir is fairly narrow, with boundaries on three sides, but is open in one direction with no closure for at least 4-1/4 miles. These boundaries approximate the shape of the grabenmore »
- Authors:
-
- ed.
- Publication Date:
- Research Org.:
- Magma Gulf/Technadril, Houston, TX (USA)
- OSTI Identifier:
- 6339843
- Report Number(s):
- DOE/NV/10081-2
ON: DE84016037
- DOE Contract Number:
- AC08-80NV10081
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 15 GEOTHERMAL ENERGY; GEOTHERMAL WELLS; TESTING; FLOW RATE; INSTALLATION; LOUISIANA; PRODUCTIVITY; RESERVOIR ENGINEERING; WASTE DISPOSAL; WELL COMPLETION; WELLHEADS; ENGINEERING; FEDERAL REGION VI; MANAGEMENT; NORTH AMERICA; USA; WASTE MANAGEMENT; WELLS; Geothermal Legacy; 150904* - Geothermal Engineering- Geothermal Reservoir & Well Performance; 150901 - Geothermal Engineering- Drilling Technology & Well Hardware
Citation Formats
Hoffman, K S. Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982. United States: N. p., 1984.
Web. doi:10.2172/6339843.
Hoffman, K S. Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982. United States. https://doi.org/10.2172/6339843
Hoffman, K S. 1984.
"Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982". United States. https://doi.org/10.2172/6339843. https://www.osti.gov/servlets/purl/6339843.
@article{osti_6339843,
title = {Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982},
author = {Hoffman, K S},
abstractNote = {The Magma Gulf-Technadril/Department of Energy Amoco Fee No. 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982. The Miogypsinoides interval contains seven discrete sands in the test well. These sands have been numbered 1 to 7, beginning at the top of the sequence. Data from wireline logs and core samples suggested that the first zone to be perforated should be Sand 5. Because of its high porosity and permeability, Sand 5 was thought to contain almost 50% of the total hydraulic capacity of the well. Flow testing of Sand 5 was performed in three stages, each of which is fully described in this report. Phase I was designed as an initial clean-up flow and a reservoir confirmation test. Phase II consisted of the reservoir limit determination test and lasted 17 days. Boundaries were confirmed which suggest that the Sweet Lake reservoir is fairly narrow, with boundaries on three sides, but is open in one direction with no closure for at least 4-1/4 miles. These boundaries approximate the shape of the graben in which the test well was drilled, but may or may not be directly related to the major faults forming the graben. Phase III testing was planned to be a long-term test at commercial design rates. Although Sand 5 alone would not support such rates, long-term production was demonstrated. Additional research not supported by DOE funding was also performed during the period covered by this report. This research, consisting of mud logging, micropaleontology, organic geochemistry, core analysis, and rock mechanics, is summarized in this report.},
doi = {10.2172/6339843},
url = {https://www.osti.gov/biblio/6339843},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jan 01 00:00:00 EST 1984},
month = {Sun Jan 01 00:00:00 EST 1984}
}