Source term evaluation for UF{sub 6} release event in feed facility at gaseous diffusion plants
An assessment of UF{sub 6} release accidents was conducted for the feed facility of a gaseous diffusion plant (GDP). Release rates from pig-tail connections were estimated from CYLIND code predictions, whereas, MELCOR was utilized for simulating reactions of UF{sub 6} with moisture and consequent transport of UO{sub 2}F{sub 2} aerosols and HF vapor through the building and to the environment. Two wind speeds were utilized. At the high end (Case 1) a wind speed of {approximately} 1 m/s (200 fpm) was assumed to flow parallel to the building length. At the low end (Case 2) to represent stagnant conditions a corresponding wind speed of 1 cm/s (2 fpm) was utilized. A further conservative assumption was made to specify no closure of crane and train doors at either end of the building. Relaxation of this assumption should provide for additional margins. Results indicated that, for the high (200 fpm) wind speed, close to 66% of the UO{sub 2}F{sub 2} aerosols and 100% of the HF gas get released to the environment over a 10-minute period. However, for the low (2 fpm) wind speed, negligible amount ({approximately} 1% UO{sub 2}F{sub 2}) of aerosols get released even over a 2 hour period.
- Research Organization:
- Oak Ridge National Lab., Engineering Technology Div., TN (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
- DOE Contract Number:
- AC05-96OR22464
- OSTI ID:
- 631151
- Report Number(s):
- ORNL/TM-13383; ON: DE98007048; TRN: 98:006984
- Resource Relation:
- Other Information: PBD: 30 Jan 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Modeling and analyses of postulated UF{sub 6} release accidents in gaseous diffusion plant
MELCOR source term evaluation for UF{sub 6} release event in a gaseous diffusion plant feed facility