Title: Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997

Abstract

The US DOE has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The ATS will foster (1) early market penetration that enhances the global competitiveness of US industry, (2) public health benefits resulting from reduced exhaust gas emissions of target pollutants, (3) reduced cost of power used in the energy-intensive industrial marketplace and (4) the retention and expansion of the skilled US technology base required for the design, development and maintenance of state-of-the-art advanced turbine products. The Industrial ATS Development and Demonstration program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program. Phase 3 of the work is separated into two subphases: Phase 3A entails Component Design and Development Phase 3B will involve Integrated Subsystem Testing. Phase 4 will cover Host Site Testing. Forecasts call for completion of the program within budget as originally estimated. Scheduled completion is forecasted to be approximately 3 years late to original plan. This delay has been intentionally planned inmore » order to better match program tasks to the anticipated availability of DOE funds. To ensure the timely realization of DOE/Solar program goals, the development schedule for the smaller system (Mercury 50) and enabling technologies has been maintained, and commissioning of the field test unit is scheduled for May of 2000. As of the end of the reporting period work on the program is 22.80% complete based upon milestones completed. This measurement is considered quite conservative as numerous drawings on the Mercury 50 are near release. Variance information is provided in Section 4.0-Program Management.« less

Publication Date:
Research Org.:
Solar Turbines, San Diego, CA (United States)
Sponsoring Org.:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
OSTI Identifier:
629475
Report Number(s):
DOE/MC/31173-24
ON: DE98054526; TRN: AHC29812%%138
DOE Contract Number:  
FC21-95MC31173
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1997]
Country of Publication:
United States
Language:
English
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; PROGRESS REPORT; GAS TURBINES; INDUSTRIAL PLANTS; ON-SITE POWER GENERATION; DESIGN; TEST FACILITIES; PERFORMANCE TESTING; DEMONSTRATION PROGRAMS

Citation Formats

. Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997. United States: N. p., 1997. Web. doi:10.2172/629475.
. Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997. United States. https://doi.org/10.2172/629475
. 1997. "Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997". United States. https://doi.org/10.2172/629475. https://www.osti.gov/servlets/purl/629475.
@article{osti_629475,
title = {Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997},
author = {},
abstractNote = {The US DOE has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The ATS will foster (1) early market penetration that enhances the global competitiveness of US industry, (2) public health benefits resulting from reduced exhaust gas emissions of target pollutants, (3) reduced cost of power used in the energy-intensive industrial marketplace and (4) the retention and expansion of the skilled US technology base required for the design, development and maintenance of state-of-the-art advanced turbine products. The Industrial ATS Development and Demonstration program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program. Phase 3 of the work is separated into two subphases: Phase 3A entails Component Design and Development Phase 3B will involve Integrated Subsystem Testing. Phase 4 will cover Host Site Testing. Forecasts call for completion of the program within budget as originally estimated. Scheduled completion is forecasted to be approximately 3 years late to original plan. This delay has been intentionally planned in order to better match program tasks to the anticipated availability of DOE funds. To ensure the timely realization of DOE/Solar program goals, the development schedule for the smaller system (Mercury 50) and enabling technologies has been maintained, and commissioning of the field test unit is scheduled for May of 2000. As of the end of the reporting period work on the program is 22.80% complete based upon milestones completed. This measurement is considered quite conservative as numerous drawings on the Mercury 50 are near release. Variance information is provided in Section 4.0-Program Management.},
doi = {10.2172/629475},
url = {https://www.osti.gov/biblio/629475}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Dec 31 00:00:00 EST 1997},
month = {Wed Dec 31 00:00:00 EST 1997}
}