Plutonium Immobilization Can Loading FY98 Year End Design Report
The Plutonium Immobilization Facility will immobilize plutonium in ceramic pucks and seal the pucks inside welded cans. Remote equipment will place these cans in magazines and the magazines in a Defense Waste Processing Facility (DWPF) canister. The DWPF will fill the canister with glass for permanent storage. This report summarizes FY98 Can Loading work completed for the Plutonium Immobilization Project and it includes summaries of reports on Can Size, Equipment Review, Preliminary Concepts, Conceptual Design, and Preliminary Specification. Plant trip reports for the Greenville Automation and Manufacturing Exposition, Rocky Flats BNFL Pu repackaging glovebox line, and vendor trips are also included.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 6204489
- Report Number(s):
- WSRC-TR-98-00310; ON: DE00004966
- Country of Publication:
- United States
- Language:
- English
Similar Records
Plutonium Immobilization Can Loading Conceptual Design
Plutonium Immobilization Can Loading Conceptual Design
Plutonium Immobilization Can Loading Conceptual Design for 13 MT Case
Technical Report
·
Thu May 13 00:00:00 EDT 1999
·
OSTI ID:6204489
Plutonium Immobilization Can Loading Conceptual Design
Technical Report
·
Thu May 13 00:00:00 EDT 1999
·
OSTI ID:6204489
Plutonium Immobilization Can Loading Conceptual Design for 13 MT Case
Technical Report
·
Wed Jan 31 00:00:00 EST 2001
·
OSTI ID:6204489