Title: Preconstruction of the Honey Lake Hybrid Power Plant: Final report

Technical Report ·
DOI:https://doi.org/10.2172/6183994· OSTI ID:6183994

The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PGandE) under existing long-term power sales contracts. Transfer of electricity to the PGandE grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 4 tabs.

Research Organization:
Geoproducts Corp., Oakland, CA (USA)
DOE Contract Number:
AC07-84ID12477
OSTI ID:
6183994
Report Number(s):
DOE/ID/12477-1; ON: DE89009145
Resource Relation:
Other Information: Portions of this document are illegible in microfiche products
Country of Publication:
United States
Language:
English