Title: Operability test procedure for rotary mode core sampling system {number_sign}3

Abstract

This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

Authors:
;
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
61112
Report Number(s):
WHC-SD-WM-OTP-174
ON: DE95011664; TRN: AHC29516%%47
DOE Contract Number:  
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 26 Apr 1995
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; RADIOACTIVE WASTE STORAGE; SAMPLERS; PERFORMANCE TESTING; RADIOACTIVE WASTES; SAMPLING; TANKS; PORTABLE EQUIPMENT; TEST FACILITIES; SIMULATION

Citation Formats

Farris, T R, and Jarecki, T D. Operability test procedure for rotary mode core sampling system {number_sign}3. United States: N. p., 1995. Web. doi:10.2172/61112.
Farris, T R, & Jarecki, T D. Operability test procedure for rotary mode core sampling system {number_sign}3. United States. https://doi.org/10.2172/61112
Farris, T R, and Jarecki, T D. 1995. "Operability test procedure for rotary mode core sampling system {number_sign}3". United States. https://doi.org/10.2172/61112. https://www.osti.gov/servlets/purl/61112.
@article{osti_61112,
title = {Operability test procedure for rotary mode core sampling system {number_sign}3},
author = {Farris, T R and Jarecki, T D},
abstractNote = {This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.},
doi = {10.2172/61112},
url = {https://www.osti.gov/biblio/61112}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Apr 26 00:00:00 EDT 1995},
month = {Wed Apr 26 00:00:00 EDT 1995}
}