skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Summary of the engineering assessment of inactive uranium mill tailings: Lakeview Site, Lakeview, Oregon

Technical Report ·
DOI:https://doi.org/10.2172/6089017· OSTI ID:6089017

Radon gas released from the 130,000 tons of tailings at the Lakeview site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The three alternative actions include millsite decontamination with the addition of 3 m of stabilization cover material (Option I) and removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II and III). Cost estimates range from $6,000,000 for stabilization in-place, to $7,500,000 for disposal at a distance of about 10 miles. Three alternatives for reprocessing the Lakeview tailings were examined. Results show that uranium recovery is not economical.

Research Organization:
Ford, Bacon and Davis Utah, Inc., Salt Lake City (USA)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC04-76GJ01658
OSTI ID:
6089017
Report Number(s):
DOE/UMT-0110S; FBDU-360-18S; ON: DE82003882; TRN: 82-000176
Country of Publication:
United States
Language:
English