Photovoltaic Manufacturing Technology (PVMaT) improvements for ENTECH's concentrator module
- ENTECH, Inc., Dallas-Fort Worth Airport, TX (United States)
This final technical report documents ENTECH's Phase 1 contract with Photovoltaic Manufacturing Technology (PVMaT) project. Under this project we prepared a detailed description of our current manufacturing process for making our unique linear Fresnel lens photovoltaic concentrator modules. In addition, we prepared a detailed description of an improved manufacturing process, which will simultaneously increase module production rates, enhance module quality, and substantially reduce module costs. We also identified potential problems in implementing the new manufacturing process, and we proposed solutions to these anticipated problems. Before discussing the key results of our program, however, we present a brief description of our unique photovoltaic technology. The key conclusion of our PVMAT Phase 1 study is that our module technology, without further breakthroughs, can realistically meet the near-term DOE goal of 12 cents/kWh levelized electricity cost, provided that we successfully implement the new manufacturing process at a production volume of at least 10 megawatts per year. The key recommendation from our Phase 1 study is to continue our PVMaT project into Phase 2A, which is directed toward the actual manufacturing technology development required for our new module production process. 15 refs.
- Research Organization:
- National Renewable Energy Lab. (NREL), Golden, CO (United States); ENTECH, Inc., Dallas-Fort Worth Airport, TX (United States)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-83CH10093
- OSTI ID:
- 6033680
- Report Number(s):
- NREL/TP-214-4486; ON: DE92001170
- Country of Publication:
- United States
- Language:
- English
Similar Records
Photovoltaic manufacturing technology (PVMAT) improvements for ENTECH's concentrator module
Photovoltaic manufacturing technology (PVMaT) improvements for ENTECH's concentrator module. Final subcontract report, 17 February 1992--14 June 1995