Summary of results from velocity profile tests and wastage tests in support of LLTR series II test A-4. [Large Leak Test Rig]
The following conclusions were drawn from the experimental program conducted in support of LLTR (Large Leak Test Rig) Series II Test A-4: Fabrication technique for making precise slits was developed. Wastage boundary agrees with velocity profile boundary. Circumferential slit angles would have to be 120/sup 0/ to ensure adequate coverage of adjacent tubes. 120/sup 0/ circumferential slit weakens tubes such that maintaining desired slit dimensions for LLTI application is not considered practical. Use of intermittent slit geometry would be required. 120/sup 0/ slits, precisely machined and precisely aligned with target tubes, produced different penetration rates on adjacent tubes. Production of simultaneous failures in LLTI with 120/sup 0/ slit or simulated interrupted slit is not considered credible.
- Research Organization:
- General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
- DOE Contract Number:
- AT03-76SF70030
- OSTI ID:
- 5982624
- Report Number(s):
- XL-796-10004; ON: DE82002310; TRN: 82-000455
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final leak sizing for LLTR Series II Test A-3 and results from supporting tests in the sonar rig. [LMFBR]
Progress report on LLTR Series II Test A-2 (Part 1). [LMFBR]
Related Subjects
LMFBR TYPE REACTORS
STEAM GENERATORS
LEAKS
TEST FACILITIES
EROSION
FABRICATION
MOLTEN METAL-WATER REACTIONS
ORIFICES
TUBES
VELOCITY
BOILERS
BREEDER REACTORS
EPITHERMAL REACTORS
FAST REACTORS
FBR TYPE REACTORS
LIQUID METAL COOLED REACTORS
OPENINGS
REACTORS
VAPOR GENERATORS
210500* - Power Reactors
Breeding