skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Analysis of reinjection strategies for The Geysers

Conference ·
OSTI ID:5982440

The Geysers has undergone severe pressure decline in recent years, and reinjection of condensate is thought to be one key to sustaining current steam production. Other methods of pressure maintenance include load cycling, or reduction of steam production during off-peak hours. It is likely that a combination of these two will prove to be optimum in providing pressure and fluid maintenance. This paper presents preliminary results of a study of various injection schemes for The Geysers. A number of injection scenarios are investigated, and an optimum scheme (based on specific parameters) is identified for two different quantities of reinjection. 9 refs., 14 figs., 1 tab.

Research Organization:
EG and G Idaho, Inc., Idaho Falls, ID (USA)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5982440
Report Number(s):
EGG-M-91026; CONF-910125-2; ON: DE91010059
Resource Relation:
Conference: 16. annual workshop on geothermal reservoir engineering, Stanford, CA (USA), 22-24 Jan 1991
Country of Publication:
United States
Language:
English