Beam position monitoring in the AGS Linac to Booster transfer line
A beam position monitor system has been developed and used in the commissioning of Brookhaven's Linac to Booster transfer line. This line transports a chopped, RF modulated H- beam from the 200 MeV Linac to the AGS Booster. Over a 15dB dynamic range in beam current, the position monitor system provides a real-time, normalized position signal with an analog bandwidth of about 20 MHz. Seven directional coupler style pickups are installed in the line with each pickup sensing both horizontal and vertical position. Analog processing electronics are located in the tunnel and incorporate the amplitude modulation to phase modulation normalization technique. To avoid interference from the 200 MHz linac RF system, processing is performed at 400 MHz. This paper will provide a system overview and report results from the commissioning experience.
- Research Organization:
- Brookhaven National Lab., Upton, NY (United States)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 5897553
- Report Number(s):
- BNL-45448; CONF-910505-435; ON: DE92007576; TRN: 92-035583
- Resource Relation:
- Conference: 1991 Institute of Electrical and Electronics Engineers (IEEE) particle accelerator conference (PAC), San Francisco, CA (United States), 6-11 May 1991
- Country of Publication:
- United States
- Language:
- English
Similar Records
A beam position monitoring system for Brookhaven's Linac to Booster transfer line
The FNAL Linac
Related Subjects
BEAM MONITORS
DESIGN
BROOKHAVEN AGS
BEAM MONITORING
BEAM POSITION
CALIBRATION
ELECTRONIC CIRCUITS
LINEAR ACCELERATORS
PARTICLE BOOSTERS
TESTING
TRANSFER FUNCTIONS
ACCELERATORS
CYCLIC ACCELERATORS
FUNCTIONS
MEASURING INSTRUMENTS
MONITORING
MONITORS
SYNCHROTRONS
430303* - Particle Accelerators- Experimental Facilities & Equipment