Title: Tunnel construction for a desertron

Technical Report ·
DOI:https://doi.org/10.2172/5653683· OSTI ID:5653683

The tunnel in this model of construction is 3-1/2 feet wide by 5 feet high. It is assumed that the tunnel contains a rail system and guidance system for: (1) An enclosed car used for transport of 2 people and some tools. (2) A magnet mover. This robot could pick up a magnet and transport it at about 10 miles per hour. (3) An alignment robot. The alignment robot would intercept E.M. waves (microwaves, lasers) to determine its position in the tunnel. Then workers could come along inside the tunnel hoop and nail it together and to the floor. The trench would then be back-filled with a 1 foot berm on top. A rail system would be installed and a support stand for the magnet.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
5653683
Report Number(s):
FERMILAB/TM-1212; ON: DE84002561
Resource Relation:
Other Information: Portions are illegible in microfiche products
Country of Publication:
United States
Language:
English