skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Hardware upgrade for klystrons in the SLC

Conference ·
OSTI ID:5616814

The control and monitoring of the klystrons in the first third of the SLAC linear accelerator has been commissioned, and a program to complete installation by summer 1985 is in progress. A general overview of the new control system for SLAC klystrons is presented along with a detailed description of the Modulator Klystron Support Unit. The MKSU contains all the devices necessary to interface klystron monitoring and control to the SLC control system through a dedicated intelligent CAMAC module. Controlled devices include RF phase and drive controls, the high power modulator status, associated RF signals, waterflow and magnet controls.

Research Organization:
Stanford Linear Accelerator Center, CA (USA)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
5616814
Report Number(s):
SLAC-PUB-3666; CONF-850504-184; ON: DE85014357
Resource Relation:
Conference: Particle accelerator conference, Vancouver, Canada, 13 May 1985; Other Information: Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English