skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Technical evaluation of the electrical, instrumentation, and control design aspects of the override of containment purge valve isolation and other engineered safety feature signals for the Fort Calhoun Nuclear Power Plant

Technical Report ·
DOI:https://doi.org/10.2172/5495224· OSTI ID:5495224

This report documents the technical evaluation of the electrical, instrumentation, and control design aspects of the override of containment purge valve isolation and other engineered safety feature signals for the Fort Calhoun nuclear power plant. The review criteria are based on IEEE Std-279-1971 requirements for the safety signals to all purge and ventilation isolation valves. This report is supplied as part of the Selected Electrical, Instrumentation, and Control Systems Issues Program being conducted for the US Nuclear Regulatory Commission by Lawrence Livermore Laboratory.

Research Organization:
EG and G, Inc., San Ramon, CA (USA). Energy Measurements Group
DOE Contract Number:
EY-76-C-08-1183
OSTI ID:
5495224
Report Number(s):
UCRL-15172; TRN: 80-005634
Country of Publication:
United States
Language:
English