Eddy-current inspection for steam generator tubing program. Annual progress report for period ending December 31, 1979
Eddy-current methods provide the best in-service inspection of steam generator tubing, but present techniques can produce ambiguity because of the many independent variables that affect the signals. The current development program has used mathematical models and developed or modified computer programs to design optimum probes, instrumentation, and techniques for multifrequency, multiproperty examinations. Interactive calculations and experimental measurements have been made with the use of modular eddy-current instrumentation and a minicomputer. These establish the coefficients for the complex equations that define the values of the desired properties (and the attainable accuracy) despite changes in other significant variables. The computer programs for calculating the accuracy with which various properties can be measured indicate that the tubing wall thickness and the defect size can be measured much more accurately than is currently required, even when other properties are varying. Our experimental measurements have confirmed these results, although more testing is needed for all the different combinations of cases and different types of defects. To facilitate the extensive laboratory scanning of the matrix of specimens that are necessary to develop algorithms for detection and analysis for all the possible combinations of positions of flaws, tube supports, and probe coils, we have designed, constructed, and begun operation of a computer-controlled automatic positioner. We have demonstrated the ability to overcome the large signals produced by the edge of the tube supports. An advanced microcomputer has been designed, constructed, and installed in the instrumentation to control the examination and provide real-time calculations of the desired properties for display recording during the scanning of the tube.
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
- DOE Contract Number:
- AC05-84OR21400
- OSTI ID:
- 5454348
- Report Number(s):
- NUREG/CR-1563; ORNL/NUREG/TM-398; ON: TI85015902
- Country of Publication:
- United States
- Language:
- English
Similar Records
Eddy-current inspection for steam generator tubing program quarterly progress report for period ending March 31, 1979
Eddy-current inspection for steam generator tubing program. Quarterly progress report, March 31, 1980
Related Subjects
42 ENGINEERING
STEAM GENERATORS
EDDY CURRENT TESTING
COMPUTER CODES
INSPECTION
RESEARCH PROGRAMS
TUBES
BOILERS
ELECTROMAGNETIC TESTING
MATERIALS TESTING
NONDESTRUCTIVE TESTING
TESTING
VAPOR GENERATORS
220200* - Nuclear Reactor Technology- Components & Accessories
420500 - Engineering- Materials Testing