Analysis of the October 5, 1979 lithium spill and fire in the Lithium Processing Test Loop
On October 5, 1979, the Lithium Processing Test Loop (LPTL) developed a lithium leak in the electromagnetic (EM) pump channel, which damaged the pump, its surrounding support structure, and the underlying floor pan. A thorough analysis of the causes and consequences of the pump failure was conducted by personnel from CEN and several other ANL divisions. Metallurgical analyses of the elliptical pump channel and adjacent piping revealed that there was a significant buildup of iron-rich crystallites and other solid material in the region of the current-carrying bus bars (region of high magnetic field), which may have resulted in a flow restriction that contributed to the deterioration of the channel walls. The location of the failure was in a region of high residual stress (due to cold work produced during channel fabrication); this failure is typical of other cold work/stress-related failures encountered in components operated in forced-circulation lithium loops. Another important result was the isolation of crystals of a compound characterized as Li/sub x/CrN/sub y/. Compounds of this type are believed to be responsible for much of the Fe, Cr, and Ni mass transfer encountered in lithium loops constructed of stainless steel. The importance of nitrogen in the mass-transfer mechanism has long been suspected, but the existence of stable ternary Li-M-N compounds (M = Fe, Cr, Ni) had not previously been verified.
- Research Organization:
- Argonne National Lab. (ANL), Argonne, IL (United States)
- DOE Contract Number:
- W-31-109-ENG-38
- OSTI ID:
- 5396630
- Report Number(s):
- ANL-81-25; ON: DE82009489; TRN: 82-011971
- Country of Publication:
- United States
- Language:
- English
Similar Records
Experimental studies of processing conditions for liquid lithium and solid lithium alloy fusion blankets
The role of carbides in the corrosion behavior of FE-12Cr-1MoVW steel in liquid lithium