Title: Cost-benefits of a mobile, trailer-contained, vibratory finishing decontamination facility

Technical Report ·
DOI:https://doi.org/10.2172/5364557· OSTI ID:5364557

The objective of this study was to determine the cost-benefits of a vibratory finishing process, developed at Pacific Northwest Laboratory (PNL), which has been used successfully to remove a variety of transuranic (TRU) contaminants from surfaces of metallic and nonmetallic wastes. Once TRU contaminants are removed, the metallic and nonmetallic materials can be disposed of as low-level waste (LLW). Otherwise, these materials would be disposed of in geologic repositories. This study provides an economic evaluation of the vibratory finishing process as a possible method for use in decontaminating and decommissioning retired facilities at Hanford and oher sites. Specifically, the economic evaluation focuses on a scoping design for a mobile, trailer-contained facility, which could be used in the field in conjunction with decontamination and decommissioning operations. The capital cost of the mobile facility is estimated to be about $1.09 million including contingency and working capital. Annual operating costs, including disposal costs, are estimated to be $440,000 for processing about 6340 ft/sup 3//yr of pre-sectioned, TRU-contaminated material. Combining the operating cost and the capital cost, annualized at a discount rate of 10%, the total annual cost estimate is $602,000. The unit cost for vibratory finishing is estimated to be about $11/ft/sup 3/ of original reference glove box volume (Abrams et at. 1980). All costs are in first quarter 1981 dollars. Although not directly comparable, the unit cost for the vibratory finishing process is very favorable when considered beside typical, substantially higher, unit costs for processing and geologically disposing of TUR-contaminated materials. The probable accuracy of this study cost estimate is about +- 30%. It is therefore recommended that a detailed cost estimate be prepared if a mobile facility is designed.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5364557
Report Number(s):
PNL-3795; ON: DE82019253
Country of Publication:
United States
Language:
English