skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Results from simulated upper-plenum aerosol transport and aerosol resuspension experiments

Conference ·
OSTI ID:5341888

Recent calculational results published as part of the Battelle-Columbus BMI-2104 source term study indicate that, for some LWR accident sequences, aerosol deposition in the reactor primary coolant system (PCS) can lead to significant reductions in the radionuclide source term. Aerosol transport and deposition in the PCS have been calculated in this study using the TRAP-MELT 2 computer code, which was developed at Battelle-Columbus; the status of validation of the TRAP-MELT 2 code has been described in an Oak Ridge National Laboratory (ORNL) report. The objective of the ORNL TRAP-MELT Validation Project, which is sponsored by the Fuel Systems Behavior Research Branch of the US Nuclear Regulatory Commission, is to conduct simulated reactor-vessel upper-plenum aerosol deposition and transport tests. The results from these tests will be used in the ongoing effort to validate TRAP-MELT 2. The TRAP-MELT Validation Project includes two experimental subtasks. In the Aerosol Transport Tests, aerosol transport in a vertical pipe is being studied; this geometry was chosen to simulate aerosol deposition and transport in the reactor-vessel upper-plenum. To date, four experiments have been performed; the results from these tests are presented in this paper. 7 refs., 4 figs., 4 tabs.

Research Organization:
Oak Ridge National Lab., TN (USA)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
5341888
Report Number(s):
CONF-8409112-6; ON: TI85016591
Resource Relation:
Conference: CSNI specialist meeting on aerosols in reactor safety, Karlsruhe, F.R. Germany, 4 Sep 1984
Country of Publication:
United States
Language:
English