Supplementary information on Series II Test A-5 test conditions
Test planning and test preparation for LLTR Series II Test A-5 are continuing at GE and ETEC. The main objective for this test is to obtain data on the type and magnitude of steam tube blowout failures resulting from worst case leak conditions under the superheater hot standby condition (i.e., the plant condition considered most susceptible to steam tube blowout failures from wastage/overheating). A corollary objective is to add large quantities of steam (i.e. approx. 330 lbs) to simulate the amount that could be added in a plant system (such as CRBRP) before pressure would build up in the intermediate Heat Transport System to blow the expansion tank rupture disc. This report recommends the preferred method for operating the LLTR primary/secondary steam systems for Test A-5. i.e., Option 5 - Common Supply Tanks for Primary and Secondary Systems.
- Research Organization:
- General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
- DOE Contract Number:
- AT03-76SF70030
- OSTI ID:
- 5338778
- Report Number(s):
- DOE/SF/70030-T51; ON: DE82005400; TRN: 82-013395
- Country of Publication:
- United States
- Language:
- English
Similar Records
Progress report on LLTR Series II Test A-2 (Part 1). [LMFBR]
Blowdown transients and implication for leak protection shutdown strategy
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
LMFBR TYPE REACTORS
STEAM GENERATORS
MOLTEN METAL-WATER REACTIONS
TEST FACILITIES
TUBES
FAILURES
LEAKS
MOCKUP
REACTOR SAFETY
BOILERS
BREEDER REACTORS
EPITHERMAL REACTORS
FAST REACTORS
FBR TYPE REACTORS
LIQUID METAL COOLED REACTORS
REACTORS
SAFETY
STRUCTURAL MODELS
VAPOR GENERATORS
220900* - Nuclear Reactor Technology- Reactor Safety
210500 - Power Reactors
Breeding