Title: Supplementary information on Series II Test A-5 test conditions

Technical Report ·
DOI:https://doi.org/10.2172/5338778· OSTI ID:5338778

Test planning and test preparation for LLTR Series II Test A-5 are continuing at GE and ETEC. The main objective for this test is to obtain data on the type and magnitude of steam tube blowout failures resulting from worst case leak conditions under the superheater hot standby condition (i.e., the plant condition considered most susceptible to steam tube blowout failures from wastage/overheating). A corollary objective is to add large quantities of steam (i.e. approx. 330 lbs) to simulate the amount that could be added in a plant system (such as CRBRP) before pressure would build up in the intermediate Heat Transport System to blow the expansion tank rupture disc. This report recommends the preferred method for operating the LLTR primary/secondary steam systems for Test A-5. i.e., Option 5 - Common Supply Tanks for Primary and Secondary Systems.

Research Organization:
General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
DOE Contract Number:
AT03-76SF70030
OSTI ID:
5338778
Report Number(s):
DOE/SF/70030-T51; ON: DE82005400; TRN: 82-013395
Country of Publication:
United States
Language:
English