skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Measurement of the enrichment of uranium in the pipework of a gas centrifuge enrichment plant

Conference ·
OSTI ID:5326264

The US and UK have been separately working on the development of a NDA instrument to determine the enrichment of gaseous UF/sub 6/ at low pressures in cascade header pipework in line with the conclusions of the Hexapartite Safeguards Project viz. the instrument is capable of making a ''go/no go'' decision of whether the enrichment is less than/greater than 20%. Recently, there has been a series of very useful technical exchanges of ideas and information between the two countries. This has led to a technical formulation for such an instrumentation based on ..gamma..-ray spectrometry which, although plant-specific in certain features, nevertheless is based on the same physical principles. Experimental results from commercially operating enrichment plants are very encouraging and indicate that a complete measurement including set up time on the pipe should be attainable in about 30 minutes when measuring pipes of diameter around 110 mm. 5 refs., 4 figs.

Research Organization:
Los Alamos National Lab., NM (USA); UKAEA Atomic Energy Research Establishment, Harwell. Nuclear Physics Div.
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
5326264
Report Number(s):
LA-UR-85-2736; CONF-850765-19; ON: DE85015730
Resource Relation:
Conference: 26. annual meeting of the Institute of Nuclear Materials Management, Albuquerque, NM, USA, 21 Jul 1985
Country of Publication:
United States
Language:
English