Gas-Cooled Thermal Reactor Program. Semiannual technical progress report, April 1, 1983-September 30, 1983
An assessment of the HTGR opportunities from the year 2000 through 2045 was the principal activity on the Market Definition Task (WBS 03). Within the Plant Technology (WBS 13) task, there were activities to develop analytical methods for investigation of Coolant Transport Behavior and to define methods and criteria for High Temperature Structural Engineering design. The activities in support of the HTGR-SC/C Lead Plant (WBS 30 and 31) were the participation in the Lead Plant System Engineering (LPSE) effort and the plant simulation task. The efforts on the Advanced HTGR systems was performed under the Modular Reactor Systems (MRS) (WBS 41) to study the potential for multiple small reactors to provide lower costs, improved safety, and higher availability than the large monolithic core reactors.
- Research Organization:
- General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
- DOE Contract Number:
- AC03-80ET34034
- OSTI ID:
- 5263500
- Report Number(s):
- GEFR-00681; ON: DE84009041
- Resource Relation:
- Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
- Country of Publication:
- United States
- Language:
- English
Similar Records
Gas-Cooled Thermal Reactor Program. Semiannual technical progress report, April 1, 1982-September 30, 1982
HTGR applications program advanced systems. Semiannual report, October 1, 1982-March 31, 1983
Related Subjects
HTGR TYPE REACTORS
RESEARCH PROGRAMS
INCONEL 617
FATIGUE
DESIGN
MARKET
ALLOYS
ALUMINIUM ALLOYS
CHROMIUM ALLOYS
COBALT ALLOYS
GAS COOLED REACTORS
GRAPHITE MODERATED REACTORS
HEAT RESISTANT MATERIALS
HEAT RESISTING ALLOYS
INCONEL ALLOYS
MATERIALS
MECHANICAL PROPERTIES
MOLYBDENUM ALLOYS
NICKEL ALLOYS
NICKEL BASE ALLOYS
REACTORS
210300* - Power Reactors
Nonbreeding
Graphite Moderated