skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: SNAP 19 Viking Program. Bimonthly technical progress report, April-May 1980

Technical Report ·
DOI:https://doi.org/10.2172/5193828· OSTI ID:5193828

Monitoring and evaluation of Viking Lander 1 power system data continued. The RTG series power range as measured at the PCDA was 65 to 67 watts at finroot temperatures between 280/sup 0/F and 310/sup 0/F. The Mars Lander performance history of Viking 1 include both the minimum and maximum data for each of the SOL days. Final available power system data for Viking Lander 2 are shown. Typical SOL day cycles for mission day 1193 are presented. The RTG series power ranged from 69 to 70 watts at finroot temperatures between 270/sup 0/F and 300/sup 0/F. The Mars Lander performance history for Viking 2 is shown. Power system performance data for Pioneer 10 and Pioneer Saturn (initially designated Pioneer 11) were monitored through the reporting period. After adjusting for the telemetry characteristics, the estimated RTG system net power was 114 watts for both Pioneer 10 and Pioneer Saturn.

Research Organization:
Teledyne Energy Systems, Timonium, MD (USA)
DOE Contract Number:
AC01-80ET32066
OSTI ID:
5193828
Report Number(s):
TES-32066-4; ON: DE84010249
Resource Relation:
Other Information: Portions are illegible in microfiche products
Country of Publication:
United States
Language:
English