skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Summary of the Hanford Site decontamination, decommissioning, and cleanup, FY 1974--FY 1990

Technical Report ·
DOI:https://doi.org/10.2172/5112307· OSTI ID:5112307

At the end of World War II, the demand for more production along with process and military surveillance changes at the Hanford Site caused a continuing cycle of building and obsolescence. This trend continued until 1964, when the cutback in plutonium production began. The cutback caused the shutdown of excess production facilities. The last of eight reactors was shut down in 1971. Since that time, N Reactor has been the only production reactor that has operated. In addition, changes in the method of separating plutonium caused a number of excess facilities in the 200 Areas. Before 1973, no structured program existed for the disposal of unusable facilities or for general cleanup. Following a plant-wide safety and housekeeping inspection in 1973, a program was developed for the disposal of all surplus facilities. Since the start of FY 1974, a total of 46 radioactively contaminated sites have been demolished and disposed of. In addition, 28 buildings have been decontaminated for in situ disposal or for reuse, 21 contaminated sites have been stabilized, 131 clean structures have been removed, and 93 clean sites have received special remedial action to eliminate potential safety and/or environmental hazards. This report summarizes these activities. 3 refs, 1 fig., 18 tabs.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
5112307
Report Number(s):
WHC-EP-0478; ON: DE92000890
Country of Publication:
United States
Language:
English