skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Final report on the development of a 2 MW/10 second battery energy storage system for power disturbance protection

Technical Report ·
DOI:https://doi.org/10.2172/503449· OSTI ID:503449

Voltage sags, swells and momentary power interruptions lasting a few cycles to several seconds are common disturbances on utility power distribution systems. These disturbances are a result of normal utility recloser switching activity due in part to distribution system short circuits from natural causes such as lightning, rodents, traffic accidents, and current overloads. Power disturbances pose serious problems for many customers with critical, voltage sensitive equipment. Faults can interrupt a manufacturing process, cause PLC`s to initialize their programmed logic and restart equipment out of sequence, create computer data errors, interrupt communications, lockup PC keyboards and cause equipment to malfunction. These momentary disturbances result in billions of dollars of lost productivity annually due to downtime, cleanup, lost production and the loss of customer confidence in the business. This report describes prototype development work for a factory assembled 2 MW/10 Second Battery Energy Storage System. The system design includes (1) a modular battery energy storage system comprised of several strings of batteries-each string provided with an integral Power Conversion System (PCS), (2) an Electronic Selector Device (ESD) comprised of a solid state static switch with sensing and power switching controls, and utility interconnection termination bus bars, and (3) a separate isolation transformer to step-up PCS output voltage to interface directly with the distribution transformer serving the industrial or commercial customer. The system monitors the utility distribution system voltage for voltage sags, swells, and interruptions, switches the customer`s critical loads from utility power to the energy stored in the systems batteries and provides up to 2 MVA until the disturbance clears or up to 10 seconds. Once the ESD sensing circuits have confirmed that the utility is again stable, it seamlessly returns the critical load to the utility. 22 figs., 1 tab.

Research Organization:
Omnion Power Engineering Corp., East Troy, WI (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
DOE Contract Number:
FC04-94AL99852
OSTI ID:
503449
Report Number(s):
DOE/AL/99852-T2; ON: DE97007307; TRN: 97:004520
Resource Relation:
Other Information: PBD: 11 Dec 1996
Country of Publication:
United States
Language:
English

Similar Records

Power Quality Evaluation of 480-V, 2-MVA UPS Systems
Conference · Wed Jun 21 00:00:00 EDT 2000 · OSTI ID:503449

Solid-state transfer will eliminate votage sags
Journal Article · Sun Oct 01 00:00:00 EDT 1995 · Electrical World · OSTI ID:503449

Tools for supplying premium quality power
Conference · Sun Dec 31 00:00:00 EST 1995 · OSTI ID:503449