Geophysics: Building E5032 decommissioning, Aberdeen Proving Ground
integration of data from surveys using three geophysical technologies has provided information used to define the locations of buried utilities, tanks, vaults, and debris near building E5032 at the Aberdeen Proving Ground. Ground penetrating radar (GPR) profiles indicate the presence of buried pipes, tanks, reinforcement rods (rebar), and remnants of railroad tracks. A magnetic map constructed from a detailed magnetic survey on the north side of the building outlines buried iron-rich objects that are interpreted to be iron pipes, tank, and other debris of uncertain origin at relatively shallow depths. Horizontal electrical resistivity surveys and vertical electrical resistivity soundings essentially corroborated the findings obtained with the magnetometer and GPR. In addition, a highly resistance layer was observed on the east side of the building where a former railroad bed with a thick grave fill is believed to immediately underlie the lawn. The resistivity data show no evidence of a conductive leachate plume. Geophysical measurements from three techniques over a buried concrete slab approximately 130 ft north of Building E5032 give geophysical signatures interpreted to be due to the presence of a large iron tank or vault. An attempt was made to gather meaningful magnetic data on the east, west, and south sides of the building; however, the quality of subsurface interpretations in those areas was poor because of the influence of surficial iron lids, pipes, grates, and the effects of the corrugated iron building itself. 11 figs., 1 tab.
- Research Organization:
- Argonne National Lab., IL (United States). Energy Systems Div.
- Sponsoring Organization:
- USDOD; Department of Defense, Washington, DC (United States)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 5009105
- Report Number(s):
- ANL/ESD/TM-20; ON: DE92002210
- Country of Publication:
- United States
- Language:
- English
Similar Records
Geophysics: Building E5440 decommissioning, Aberdeen Proving Ground. Interim progress report
Geophysics: Building E5282 decommissioning, Aberdeen Proving Ground
Related Subjects
47 OTHER INSTRUMENTATION
54 ENVIRONMENTAL SCIENCES
GEOPHYSICAL SURVEYS
TECHNOLOGY ASSESSMENT
MILITARY FACILITIES
SITE CHARACTERIZATION
CONCRETES
DECOMMISSIONING
ELECTRIC CONDUCTIVITY
GEOPHYSICS
MAGNETIC SURVEYS
MAPPING
PIPES
PLUMES
PROGRESS REPORT
RADAR
SOILS
TANKS
UNDERGROUND DISPOSAL
BUILDING MATERIALS
CONTAINERS
DOCUMENT TYPES
ELECTRICAL PROPERTIES
MANAGEMENT
MATERIALS
MEASURING INSTRUMENTS
PHYSICAL PROPERTIES
RANGE FINDERS
SURVEYS
WASTE DISPOSAL
WASTE MANAGEMENT
580000* - Geosciences
440700 - Geophysical & Meteorological Instrumentation- (1990-)
540250 - Environment
Terrestrial- Site Resource & Use Studies- (1990-)