Acceptance Test Report for 241-SY Pump Cradle Hydraulic System
The purpose of this ATP is to verify that hydraulic system/cylinder procured to replace the cable/winch system on the 101-SY Mitigation Pump cradle assembly fulfills its functional requirements for raising and lowering the cradle assembly between 70 and 90 degrees, both with and without pump. A system design review was performed on the 101-SY Cradle Hydraulic System by the vendor before shipping (See WHC-SD-WM-DRR-045, 241-SY-101 Cradle Hydraulic System Design Review). The scope of this plan focuses on verification of the systems ability to rotate the cradle assembly and any load through the required range of motion.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 48722
- Report Number(s):
- WHC-SD-WM-ATR-094; ON: DE95009095; TRN: 95:011745
- Resource Relation:
- Other Information: PBD: 8 Mar 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance test report for tank bottom thermocouples on Tank 241-SY-101
241-SY-101 mixer pump lifetime expectancy. Final report
Hazard evaluation for transfer of waste from tank 241-SY-101 to tank 241-SY-102
Technical Report
·
Thu Dec 01 00:00:00 EST 1994
·
OSTI ID:48722
241-SY-101 mixer pump lifetime expectancy. Final report
Technical Report
·
Fri Dec 08 00:00:00 EST 1995
·
OSTI ID:48722
Hazard evaluation for transfer of waste from tank 241-SY-101 to tank 241-SY-102
Technical Report
·
Fri Feb 12 00:00:00 EST 1999
·
OSTI ID:48722