Title: Acceptance test procedure for K basins dose reduction project clean and coat equipment

Technical Report ·
DOI:https://doi.org/10.2172/483514· OSTI ID:483514

This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment`s ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
483514
Report Number(s):
WHC-SD-SNF-ATP-020; ON: DE97052764; TRN: 97:011239
Resource Relation:
Other Information: PBD: 11 Mar 1996
Country of Publication:
United States
Language:
English

Similar Records

Calculations & Analyses to Support K West Basin Canister Cleaning System Project A-2A
Technical Report · Mon Sep 17 00:00:00 EDT 2001 · OSTI ID:483514

Breathing air trailer acceptance test report
Technical Report · Mon Feb 12 00:00:00 EST 1996 · OSTI ID:483514

Cone penetrometer moisture probe acceptance test report
Technical Report · Tue Apr 23 00:00:00 EDT 1996 · OSTI ID:483514