Advanced Turbine Systems program conceptual design and product development. Quarterly report, February--April 1994
Task 8.5 (active clearance control) was replaced with a test of the 2600F prototype turbine (Task 8.1T). Test 8.1B (Build/Teardown of prototype turbine) was added. Tasks 4 (conversion of gas-fired turbine to coal-fired turbine) and 5 (market study) were kicked off in February. Task 6 (conceptual design) was also initiated. Task 8.1 (advanced cooling technology) now has an approved test plan. Task 8.4 (ultra low NOx combustion technology) has completed the code development and background gathering phase. Task 8.6 (two-phase cooling of turbine vanes) is proceeding well; initial estimates indicate that nearly 2/3 of required cooling flow can be eliminated.
- Research Organization:
- Allison Engine Co., Indianapolis, IN (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC21-93MC29257
- OSTI ID:
- 45919
- Report Number(s):
- DOE/MC/29257-4005; ON: DE95000077
- Resource Relation:
- Other Information: PBD: Feb 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Advanced turbine systems program conceptual design and product development. Quarterly report, May--July 1994
Advanced Turbine Systems program conceptual design and product development. Quarterly report, August--October 1994
Advanced turbine systems program conceptual design and product development: Quarterly report, November 1993--January 1994
Technical Report
·
Sat Oct 01 00:00:00 EDT 1994
·
OSTI ID:45919
Advanced Turbine Systems program conceptual design and product development. Quarterly report, August--October 1994
Technical Report
·
Sun Jan 01 00:00:00 EST 1995
·
OSTI ID:45919
Advanced turbine systems program conceptual design and product development: Quarterly report, November 1993--January 1994
Technical Report
·
Sun Jan 01 00:00:00 EST 1995
·
OSTI ID:45919