Geotechnical analysis report for July 1994--June 1995
The geotechnical data from the underground excavations at the WIPP are interpreted and presented in this Geotechnical Analysis Report. The data are used to characterize conditions, assess design assumptions, and understand and predict the performance of the underground excavations during operations. The data are obtained as part of a regular monitoring program. They do not include data from tests performed by Sandia National Laboratories, the Scientific Advisor to the project in support of performance assessment studies. Geotechnical Analysis Reports have been prepared routinely and made available to the public since 1983. During the Site and Preliminary Design Validation Program, the Architect/Engineer for the project produced the reports on a quarterly basis to document the geomechanical performance during and immediately after construction of the underground. Upon completion of the constriction phase of the project in 1987, the reports have been prepared annually by the Management and Operating Contractor for the facility. This report describes the performance and conditions of selected areas from July 1, 1994, to June 30, 1995.
- Research Organization:
- Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-86AL31950
- OSTI ID:
- 399707
- Report Number(s):
- DOE/WIPP-96-2193; ON: DE97000846; TRN: 97:000687
- Resource Relation:
- Other Information: PBD: Sep 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Geotechnical Analysis Report for July 1999-June 2000
Geotechnical Analysis Report for July 1998-June 1999