Recalculation of shielding for the addition of a PAR
The shielding estimates for the Electron and Positron Linacs and the Booster Synchrotron, contained in the 1987 Conceptual Design Report (CDR) of the APS (ANL-87-15), have been reviewed and recalculated, along with newly initiated calculations of the required shielding for the addition of a Positron Accumulator Ring (PAR). Several new assumptions with respect to beam intensity, projected losses in the system, and assumed operational time have been incorporated into the calculations. Details of the previous calculations, which describe the methodology used, may be found in APS Light Source Note LS-90.
- Research Organization:
- Argonne National Lab. (ANL), Argonne, IL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 376377
- Report Number(s):
- LS-116(ANL); ON: DE96015108; TRN: 96:005416
- Resource Relation:
- Other Information: PBD: Aug 1988
- Country of Publication:
- United States
- Language:
- English
Similar Records
Dose estimates for the 1104 m APS storage ring
Annex to 7-GeV Advanced Photon Source Conceptual Design Report
Radiological considerations in the operation of the low-energy undulator test line (LEUTL).
Technical Report
·
Thu Jun 01 00:00:00 EDT 1989
·
OSTI ID:376377
Annex to 7-GeV Advanced Photon Source Conceptual Design Report
Technical Report
·
Sun May 01 00:00:00 EDT 1988
·
OSTI ID:376377
Radiological considerations in the operation of the low-energy undulator test line (LEUTL).
Technical Report
·
Wed Nov 11 00:00:00 EST 1998
·
OSTI ID:376377