skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Time Delays Between Core Power Production and External Detector Response from Monte Carlo Calculations

Conference ·
OSTI ID:373764
 [1];  [1]
  1. Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States). Instrumentation and Controls Division, Measurements Science Section

One primary concern for design of safety systems for reactors is the time response of external detectors to changes in the core. This paper describes a way to estimate the time delay between the core power production and the external detector response using Monte Carlo calculations and suggests a technique to measure the time delay. The Monte Carlo code KENO-NR was used to determine the time delay between the core power production and the external detector response for a conceptual design of the Advanced Neutron Source (ANS) reactor. The Monte Carlo estimated time delay was determined to be about 10 ms for this conceptual design of the ANS reactor.

Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States). Instrumentation and Controls Division, Measurements Science Section
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA), Nuclear Criticality Safety Program (NCSP)
DOE Contract Number:
AC05-96OR22464
OSTI ID:
373764
Report Number(s):
CONF-960924-2; ON: DE96013779; TRN: 96:024864
Resource Relation:
Conference: PHYSOR '96: International Conference on the Physics of Reactors, Mito (Japan), 16-20 Sep 1996; Other Information: PBD: [1996]
Country of Publication:
United States
Language:
English