LDUA software custodian`s notebook
This plan describes the activities to be performed and controls to be applied to the process of specifying, obtaining, and qualifying the control and data acquisition software for the Light Duty Utility Arm (LDUA) System. It serves the purpose of a software quality assurance plan, a verification and validation plan, and a configuration management plan. This plan applies to all software that is an integral part of the LDUA control and data acquisition system, that is, software that is installed in the computers that are part of the LDUA system as it is deployed in the field. This plan applies to the entire development process, including: requirements; design; implementation; and operations and maintenance. This plan does not apply to any software that is not integral with the LDUA system. This plan has-been prepared in accordance with WHC-CM-6-1 Engineering Practices, EP-2.1; WHC-CM-3-10 Software Practices; and WHC-CM-4-2, QR 19.0, Software Quality Assurance Requirements.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 362553
- Report Number(s):
- HNF-3223; ON: DE99050929; BR: EW3120074; TRN: AHC29926%%208
- Resource Relation:
- Other Information: PBD: 20 Aug 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Computer software design description for the integrated control and data acquisition system LDUA system
An approach to software quality assurance for robotic inspection systems