Sequence and batch language programs and alarm related C Programs for the 242-A MCS
A Distributive Process Control system was purchased by Project B-534, 242-A Evaporator/Crystallizer Upgrades. This control system, called the Monitor and Control system (MCS), was installed in the 242-A evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment Systems Engineering (WTSE) group of Westinghouse. The standard displays and alarm scheme provide for control and monitoring, but do not directly indicate the signal location or depict the overall process. To do this, WTSE developed a second alarm scheme.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 362538
- Report Number(s):
- WHC-SD-534-CSWL-001-Rev.3; ON: DE99050386; BR: EW3120071; TRN: AHC29926%%193
- Resource Relation:
- Other Information: PBD: 15 Apr 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
242-A Control System device logic software documentation. Revision 2
Continuous control databases for the 242A MCS