B Plant canyon sample TK-21-1 analytical results for the final report
Abstract
This document is the analytical laboratory report for the TK-21-1 sample collected from the B Plant Canyon on February 18, 1998. The sample was analyzed in accordance with the Sampling and Analysis Plan for B Plant Solutions (SAP) (Simmons, 1997) in support of the B Plant decommissioning project. Samples were analyzed to provide data both to describe the material which would remain in the tanks after the B Plant transition is complete and to determine Tank Farm compatibility. The analytical results are included in the data summary table (Table 1).
- Authors:
- Publication Date:
- Research Org.:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Org.:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- OSTI Identifier:
- 362475
- Report Number(s):
- HNF-SD-WM-DP-301
ON: DE99050636; BR: EW3120074; TRN: AHC29926%%130
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 10 Apr 1998
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 05 NUCLEAR FUELS; HANFORD RESERVATION; FUEL REPROCESSING PLANTS; SAMPLING; CHEMICAL ANALYSIS; DECOMMISSIONING; SITE CHARACTERIZATION; TANKS; RADIOACTIVE WASTE MANAGEMENT
Citation Formats
Steen, F H. B Plant canyon sample TK-21-1 analytical results for the final report. United States: N. p., 1998.
Web. doi:10.2172/362475.
Steen, F H. B Plant canyon sample TK-21-1 analytical results for the final report. United States. https://doi.org/10.2172/362475
Steen, F H. 1998.
"B Plant canyon sample TK-21-1 analytical results for the final report". United States. https://doi.org/10.2172/362475. https://www.osti.gov/servlets/purl/362475.
@article{osti_362475,
title = {B Plant canyon sample TK-21-1 analytical results for the final report},
author = {Steen, F H},
abstractNote = {This document is the analytical laboratory report for the TK-21-1 sample collected from the B Plant Canyon on February 18, 1998. The sample was analyzed in accordance with the Sampling and Analysis Plan for B Plant Solutions (SAP) (Simmons, 1997) in support of the B Plant decommissioning project. Samples were analyzed to provide data both to describe the material which would remain in the tanks after the B Plant transition is complete and to determine Tank Farm compatibility. The analytical results are included in the data summary table (Table 1).},
doi = {10.2172/362475},
url = {https://www.osti.gov/biblio/362475},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Apr 10 00:00:00 EDT 1998},
month = {Fri Apr 10 00:00:00 EDT 1998}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.