skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: ATP for the portable 500 CFM exhauster POR-004 skid B

Abstract

This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-004 to be used for saltwell pumping. The Portable Exhauster System will be utilized to eliminate potential flammable gases that may exist within the dome space of the tank. This Acceptance Plan will test and verify that the exhauster meets the specified design criteria, safety requirements, operations requirements, and will provide a record of the functional test results.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
362451
Report Number(s):
HNF-SD-WM-ATP-198
ON: DE99050996; BR: EW3120072; TRN: AHC29926%%105
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 6 May 1997
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; STORAGE FACILITIES; VENTILATION SYSTEMS; BLOWERS; PERFORMANCE TESTING; GASES; FLAMMABILITY; SAFETY ENGINEERING

Citation Formats

Keller, C M. ATP for the portable 500 CFM exhauster POR-004 skid B. United States: N. p., 1997. Web. doi:10.2172/362451.
Keller, C M. ATP for the portable 500 CFM exhauster POR-004 skid B. United States. https://doi.org/10.2172/362451
Keller, C M. 1997. "ATP for the portable 500 CFM exhauster POR-004 skid B". United States. https://doi.org/10.2172/362451. https://www.osti.gov/servlets/purl/362451.
@article{osti_362451,
title = {ATP for the portable 500 CFM exhauster POR-004 skid B},
author = {Keller, C M},
abstractNote = {This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-004 to be used for saltwell pumping. The Portable Exhauster System will be utilized to eliminate potential flammable gases that may exist within the dome space of the tank. This Acceptance Plan will test and verify that the exhauster meets the specified design criteria, safety requirements, operations requirements, and will provide a record of the functional test results.},
doi = {10.2172/362451},
url = {https://www.osti.gov/biblio/362451}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue May 06 00:00:00 EDT 1997},
month = {Tue May 06 00:00:00 EDT 1997}
}