Title: 324 Facility B-cell quality process plan

Abstract

B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell;

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
353327
Report Number(s):
HNF-2286-Rev.3
ON: DE99050884; BR: EX7050000; TRN: AHC29923%%159
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 29 Jul 1998
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; HOT CELLS; DECOMMISSIONING; EQUIPMENT; LOW-LEVEL RADIOACTIVE WASTES; HAZARDOUS MATERIALS; REMOVAL; CUTTING; TRANSPORT; FUEL RACKS; SPENT FUELS; RADIOACTIVE WASTE STORAGE

Citation Formats

Carlson, J L. 324 Facility B-cell quality process plan. United States: N. p., 1998. Web. doi:10.2172/353327.
Carlson, J L. 324 Facility B-cell quality process plan. United States. https://doi.org/10.2172/353327
Carlson, J L. 1998. "324 Facility B-cell quality process plan". United States. https://doi.org/10.2172/353327. https://www.osti.gov/servlets/purl/353327.
@article{osti_353327,
title = {324 Facility B-cell quality process plan},
author = {Carlson, J L},
abstractNote = {B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell;},
doi = {10.2172/353327},
url = {https://www.osti.gov/biblio/353327}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jul 29 00:00:00 EDT 1998},
month = {Wed Jul 29 00:00:00 EDT 1998}
}