Evaluation of the 296-C-006 HVAC system for tank 241-C-106
Prior to the sluicing of Tank 241-C-106, the 296-P-16 ventilation system will be shutdown and the 296-C-006 ventilation system operation will be initiated. The 296-C-006 system has a low once through flow with an additional recirculation flow in the tank dome space. A minimum dome pressure of -3 in W.G. is necessary for safe operation. An evaluation of the system has been performed. The results of the study show that adequate dome space vacuum can be achieved if the pump pits in Tank 241-C-106 are sealed.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 350900
- Report Number(s):
- HNF-2935; ON: DE99050752; BR: EW3130010; TRN: AHC29921%%85
- Resource Relation:
- Other Information: PBD: 3 Sep 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
C-106 tank process ventilation test
Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III
Origins of volatile organic compounds emerging from tank 241-C-106 during sluicing
Technical Report
·
Mon Jul 20 00:00:00 EDT 1998
·
OSTI ID:350900
Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III
Technical Report
·
Fri Aug 13 00:00:00 EDT 1999
·
OSTI ID:350900
Origins of volatile organic compounds emerging from tank 241-C-106 during sluicing
Technical Report
·
Wed Jun 02 00:00:00 EDT 1999
·
OSTI ID:350900