Spent nuclear fuel project design basis capacity study
A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 344999
- Report Number(s):
- HNF-SD-SNF-RPT-011-Rev.1; ON: DE99050855; BR: EW3135040; TRN: 99:004877
- Resource Relation:
- Other Information: PBD: 22 Jul 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study
Spent nuclear fuel project design basis capacity study
Development of design basis capacity for SNF project systems
Technical Report
·
Thu Aug 17 00:00:00 EDT 2000
·
OSTI ID:344999
Spent nuclear fuel project design basis capacity study
Technical Report
·
Mon Sep 09 00:00:00 EDT 1996
·
OSTI ID:344999
Development of design basis capacity for SNF project systems
Technical Report
·
Tue Feb 27 00:00:00 EST 1996
·
OSTI ID:344999