Operability test procedure for 244-U DCRT. Revision 1
This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 34337
- Report Number(s):
- WHC-SD-ER3641-OTP-001-Rev.1; ON: DE95009104; TRN: 95:009711
- Resource Relation:
- Other Information: PBD: 13 Mar 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
OTP for 244-U radiation monitoring system. Revision 1
244-CR Vault Interim Stabilization Project Plan
Acceptance test procedure for SY Tank Farm replacement exhauster unit
Technical Report
·
Mon Mar 13 00:00:00 EST 1995
·
OSTI ID:34337
244-CR Vault Interim Stabilization Project Plan
Technical Report
·
Tue Apr 25 00:00:00 EDT 2000
·
OSTI ID:34337
Acceptance test procedure for SY Tank Farm replacement exhauster unit
Technical Report
·
Fri Dec 16 00:00:00 EST 1994
·
OSTI ID:34337