Project W-320 high vacuum 241-AY-102 annulus ventilation system operability test report
This report documents the test results of OTP-320-001, Tank 241-AY-102 Annulus Ventilation System Testing. Included in the appendices are: (1) Supporting documentation prepared to demonstrate the structural integrity of the tank at high annulus vacuum (<20 INWG), and (2) a report that identifies potential cross connections between the primary and annulus ventilation systems. These cross connections were verified to be eliminated prior to the start of testing.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 341263
- Report Number(s):
- HNF-2317; ON: DE99050588; BR: EW3130010; TRN: 99:004933
- Resource Relation:
- Other Information: PBD: 12 Mar 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Calculation note: project W-320 primary ventilation air flowrequirements for mitigation of steady state flammable gasconcentrations in the headspaces of tanks 241-C-106 and 241-AY-102
ANALYSIS OF CORROSION PRODUCT RETRIEVED FROM THE PRIMARY TANK WALL IN THE ANNULUS OF TANK 241-AY-102
Operational test report -- Project W-320 cathodic protection systems
Technical Report
·
Wed Jun 04 00:00:00 EDT 1997
·
OSTI ID:341263
ANALYSIS OF CORROSION PRODUCT RETRIEVED FROM THE PRIMARY TANK WALL IN THE ANNULUS OF TANK 241-AY-102
Technical Report
·
Tue Jun 03 00:00:00 EDT 2003
·
OSTI ID:341263
Operational test report -- Project W-320 cathodic protection systems
Technical Report
·
Tue Jun 16 00:00:00 EDT 1998
·
OSTI ID:341263