W-026 acceptance test plan plant control system software (submittal {number_sign} 216)
Abstract
Acceptance Testing of the WRAP 1 Plant Control System software will be conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests will be broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. The acceptance test report will contain completed copies of the software tests along with the applicable test log and completed Exception Test Reports.
- Authors:
- Publication Date:
- Research Org.:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Org.:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- OSTI Identifier:
- 330749
- Report Number(s):
- HNF-SD-W026-ATP-027
ON: DE98059632; BR: 39EW31300; TRN: 97000105
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 14 Feb 1997
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 05 NUCLEAR FUELS; RADIOACTIVE WASTE FACILITIES; CONTROL SYSTEMS; COMPUTER CODES; TESTING; PLANNING
Citation Formats
Watson, T.L., Fluor Daniel Hanford. W-026 acceptance test plan plant control system software (submittal {number_sign} 216). United States: N. p., 1997.
Web. doi:10.2172/330749.
Watson, T.L., Fluor Daniel Hanford. W-026 acceptance test plan plant control system software (submittal {number_sign} 216). United States. https://doi.org/10.2172/330749
Watson, T.L., Fluor Daniel Hanford. 1997.
"W-026 acceptance test plan plant control system software (submittal {number_sign} 216)". United States. https://doi.org/10.2172/330749. https://www.osti.gov/servlets/purl/330749.
@article{osti_330749,
title = {W-026 acceptance test plan plant control system software (submittal {number_sign} 216)},
author = {Watson, T.L., Fluor Daniel Hanford},
abstractNote = {Acceptance Testing of the WRAP 1 Plant Control System software will be conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests will be broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. The acceptance test report will contain completed copies of the software tests along with the applicable test log and completed Exception Test Reports.},
doi = {10.2172/330749},
url = {https://www.osti.gov/biblio/330749},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Feb 14 00:00:00 EST 1997},
month = {Fri Feb 14 00:00:00 EST 1997}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.