skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cradle/pump heating system operation and maintenance manual

Technical Report ·
DOI:https://doi.org/10.2172/329787· OSTI ID:329787

This is the operation and maintenance manual for the 241-SY-101 Cradle/Pump Heating System. The Heating System provides the means to heat the pump (HMT {number_sign}2) during cold weather to assure safe and smooth pump installation.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
329787
Report Number(s):
HNF-SD-WM-OMM-026; ON: DE98059636; BR: EW3120072; TRN: 97000137
Resource Relation:
Other Information: PBD: 1 Feb 1997
Country of Publication:
United States
Language:
English

Similar Records

Acceptance Test Report for 241-SY Pump Cradle Hydraulic System
Technical Report · Wed Mar 08 00:00:00 EST 1995 · OSTI ID:329787

Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3
Technical Report · Fri Aug 15 00:00:00 EDT 1997 · OSTI ID:329787

241-SY-101 Flexible Receiver System operation and maintenance manual
Technical Report · Wed May 03 00:00:00 EDT 1995 · OSTI ID:329787