W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)
Acceptance Testing of the WRAP 1 Plant Control System Hardware will be conducted throughout the construction of WRAP I with the final testing on the Process Area hardware being completed in November 1996. The hardware tests will be broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DNS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document will contain completed copies of each of the hardware tests along with the applicable test logs and completed test exception reports.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 328704
- Report Number(s):
- HNF-SD-W026-ATP-022; ON: DE98059597; BR: 39EW31300; TRN: 97000104
- Resource Relation:
- Other Information: PBD: 14 Feb 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
W-026 acceptance test report plant control system hardware (submittal {number_sign} 220.C)
W-026 acceptance test plan plant control system software (submittal {number_sign} 216)
W-026 acceptance test report plant control system software(submittal {number_sign}223.02)
Technical Report
·
Fri Feb 14 00:00:00 EST 1997
·
OSTI ID:328704
W-026 acceptance test plan plant control system software (submittal {number_sign} 216)
Technical Report
·
Fri Feb 14 00:00:00 EST 1997
·
OSTI ID:328704
W-026 acceptance test report plant control system software(submittal {number_sign}223.02)
Technical Report
·
Fri Feb 14 00:00:00 EST 1997
·
OSTI ID:328704