skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: High level waste interim storge architecture selection - decision report

Technical Report ·
DOI:https://doi.org/10.2172/328190· OSTI ID:328190

The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture Evaluation results and recommendations. However, the Board required changes to some criteria definitions and weightings in establishing its own recommendation basis. This report documents information presented to the Decision Board, and the Decision Board`s recommendations and basis for these recommendations. The Board`s recommendations were fully adopted by the WHC Decision Maker, R. J. Murkowski, Manager, TWRS Storage and Disposal. The Decision Board`s recommendation is as follows. The Phase I BLW Interim storage concept architecture will use Vaults 2 and 3 of the Hanford Site Spent Nuclear Fuel Canister Storage Building, being located in the Hanford Site 200 East Area, and include features to faciliate addition of one or more vaults at a later date.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
328190
Report Number(s):
WHC-SD-WM-TA-183; ON: DE98058540; BR: EW3130010; TRN: 96000954
Resource Relation:
Other Information: PBD: 27 Sep 1996
Country of Publication:
United States
Language:
English