Plutonium stabilization and handling (PuSH)
This Functional Design Criteria (FDC) addresses construction of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. The major sections of the project are: site preparation; SPS Procurement, Installation, and Testing; storage vault modification; and characterization equipment additions. The SPS will be procured as part of a Department of Energy nationwide common procurement. Specific design crit1460eria for the SPS have been extracted from that contract and are contained in an appendix to this document.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 325828
- Report Number(s):
- HNF-SD-W460-FDC-001; ON: DE98059542; BR: EW7003000; TRN: 97000033
- Resource Relation:
- Other Information: PBD: 23 Jan 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Functional Design Criteria plutonium stabilization and handling (PUSH) project W-460
Plutonium stabilization and handling quality assurance program plan