Calculation of SY tank annulus continuous air monitor readings after postulated leak scenarios
The objective of this work was to determine whether or not a continuous air monitor (CAM) monitoring the annulus of one of the SY Tanks would be expected to alarm after three postulated leak scenarios. Using data and references provided by Lockheed Martin`s Tank Farm personnel, estimated CAM readings were calculated at specific times after the postulated scenarios might have occurred. Potential CAM readings above background at different times were calculated for the following leak scenarios: Leak rate of 0.01 gal/min; Leak rate of 0.03 gal/min (best estimate of the maximum probable leak rate from a single-shell tank); and Leak of 73 gal (equivalent to a {1/4}-in. leak on the floor of the annulus). The equation used to make the calculations along with descriptions and/or explanations of the terms are included, as is a list of the assumptions and/or values used for the calculations.
- Research Organization:
- Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Civilian Radioactive Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 290875
- Report Number(s):
- PNNL-11956; R&D Project: N/A; ON: DE98058039; BR: N/A; TRN: 99:002116
- Resource Relation:
- Other Information: PBD: Aug 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Test Plan for New SY Farm Annulus Leak Detectors
Engineering task plan for the new SY farm annulus leak detectors